It is agreed and understood that otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed thereon, the Insurers shall only indemnify the Insured for loss, damage or liability caused directly or indirectly by precipitation, flood or inundation if adequate safety measures have been taken in designing and executing the project involved.
For the purposes of this Endorsement adequate safety measures shall mean that, at all times throughout the policy period, allowance is made for precipitation, flood and inundation up to a return period of 20 years for the location insured on the basis of the statistics prepared by the meteorological agencies.
Loss, damage or liability resulting from the Insured’s not immediately removing obstructions (e.g. sand, trees) from watercourses within the construction site, whether carrying water or not, in order to maintain free waterflow shall not be indemnifiable.
Home » Engineering Clause » Endorsement 110 Special conditions concerning safety measures with respect to precipitation, flood and inundation
Kamis, November 12, 2015
Endorsement 110 Special conditions concerning safety measures with respect to precipitation, flood and inundation
Related Posts
- Endorsement 1309 Special insurance cover: delay in repair
- Endorsement 1308 Special insurance cover: failure of public power, water, gas or steam supply
- Endorsement 1307 Special insurance cover: additional expenditure other than increased cost of working
- Endorsement 1306 Special insurance cover: maximum demand charges
- Endorsement 1305 Special insurance cover: prolongation of the interruption period due to deterioration
Stay Tuned with our News Letter
Don't miss out on the latest
news, sign up for our Newsletter.
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar